|
Product Details:
|
| Rated Evaporation: | 0.5-2T/h | Rated Working Pressure: | 0.7/1.0/1.25Mpa |
|---|---|---|---|
| Staturated Steam Temperature: | 170/193/184℃ | Fuel: | Natural Gas/Liquefied Gas/Pipeline Gas |
| Overall Size: | Depend | Weight: | The Models Are Different |
| Highlight: | 1.25Mpa lpg fired steam boiler,Packaging gas powered steam boiler |
||
Low Heat Loss Gas Fired Steam Boiler Equipment LSS Series For Auxiliary Packaging
Product introduction
Parameter
| Type | LSS0.5 | LSS1 | LSS1.5 | LSS2 | ||
| Project | Unit | |||||
| Rated evaporation | t/h | 0.5 | 1 | 1.5 | 2 | |
| Rated working pressure | MPa | 0.7/1.0 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |
| Staturated steam temperature | ℃ | 170/193 | 184/193 | 184/193 | 184/193 | |
| Fuel consumption | Light diesel oil | kg/h | 35 | 70 | 105 | 140 |
| Natural gas | Nm³/h | 40 | 80 | 120 | 160 | |
| LPG | Nm³/h | 15 | 30 | 45 | 60 | |
| City gas | Nm³/h | 85 | 170 | 265 | 340 | |
| a Main steam valve diameter | DN | 40 | 50 | 65 | 80 | |
| b Safety valve diameter | DN | 40 | 50 | 50 | 40×2 | |
| c Inlet diamater | DN | 25 | 25 | 32 | 40 | |
| d Blowoff Valve diameter | DN | 25 | 40 | 40 | 40 | |
| e Chimney diameter | DN | 250 | 350 | 400 | 500 | |
| Overall size | L | mm | 1830 | 1980 | 2045 | 2550 |
| W | mm | 1780 | 1980 | 2220 | 2780 | |
| H | mm | 2650 | 3080 | 3380 | 3620 | |
| H1 | mm | 2100 | 2300 | 2650 | 2880 | |
| φDiameter | mm | 1180 | 1380 | 1680 | 1980 | |
| Weight | T | 1.8/2.2 | 2.3/2.8 | 3.3/4 | 4.3/5.2 | |
Feature
1 . Pipe flow type, vertical three return
2 . The furnace starts fast
3 . Low exhaust gas temperature and low heat loss
4 . High thermal efficiency
5 . Various protection devices are complete
Product picture
![]()
Project case diagram
![]()
FAQ
Q : Are you a factory or a trading company?
A : We are a 20 years old industrial boiler factory, specializing in gas oil diesel electric fired boilers.
Q : What is the Warranty for the boilers?
A : Our steam boiler warranty is one year, During the warranty period, any parts damaged, you can get a new parts for free.
Q : How long should we wait for delivery?
A : Usually it will take about 35-45 days for pressured boilers, If you need to change the voltage or pressure, it need more time.
Q : What about your payment term?
A : Usually it would be 30% deposit payment, 70% balance before delivery. We accept T/T, L/C and other payment way.
Contact Person: Mrs. Sonja .S
Tel: +86 17701567985
Fax: 86-512-58698850