What problems should we pay attention to during the installation and maintenance of electric steam generators?
Above steam boilers are designed and developed according to <
1.Small electric steam boilers with compact size, automatic water feeding pumps inside, fuly automatic water level and pressure control, could continuous work.
2.Boiler water capacity less than 30 liters, avoid complicated approval procedures of annual evaluation.
3.Steam output valves could connect both hard tubes and high temperature resistant steam hose , flexible ,make full usage of space.
4.Smart size ,convenient to be moved ,installation and usage.
Product usage directions
1.Check all kinds of pipeline, connection and instruments to see weather there are any flexible or damage.
2.The electric line should be checked also to see weather there are looses or other damage--especially the power wire connection.
3.Check whether any other damage.
4.Check all the electric lines to see whether they are match up to the instructions in the circuit diagrams.Note: it is necessary to have reliable ground wire --connect to machine out cover.
5.Power line selection should be based on the heater power selection, the specific selection criteria, please refer to the appendix table 1 below。
6.Water tank inside, water level controlled by ball float valve, ensure feed water has pressure by 0.05-0.15Mpa.
7.Connect water source to soft water tank inlet part, Deep well water and river water and other non-soft water is not allowed. Note: Any fault caused by using non softened water--not in the scope of the warranty Do not use distilled water, pure water and other similar low conductivity medium, it will affect the accuracy of water level control detection.
8.During water pump usage or the first time use water pump, if the air enter into the pump, should loose the screw of the add water plug beside the water outlet of the pump, let it fill with water and tightening the water plug --for details, please check daily maintenance.
9.Close blow down valve and steam output valve.Note: Please connect safety valve to safety place out door, blow down valve should fix and connect into drains.
10.Before using this equipment, please check the leakage protection function.
11.After all above checking qualified, then could start.
Contact Person: Mrs. Sonja .S
Tel: +86 17701567985
Fax: 86-512-58698850