Home ProductsGas Fired Steam Generator

250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure

Certification
China Zhangjiagang Wilford Thermal Co.,Ltd. certification
China Zhangjiagang Wilford Thermal Co.,Ltd. certification
Customer Reviews
The quality of the boiler is very good. The service life of the boiler I purchased has reached more than 10 years.

—— Alain

The quality of your company's boilers has reached our standards, and the salesmen are doing their best to help me.

—— Masud

Your company's boilers are safe and durable, and we look forward to our next cooperation.

—— James

غلاية ذات نوعية جيدة ، وموقف موظفي ما بعد البيع جيدة جدا ، وكفاءة العمل عالية.

—— TONNY

Качество котла очень хорошее, торговый персонал очень терпелив, а обслуживание хорошее.

—— Сатиск

I'm Online Chat Now

250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure

250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure
250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure 250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure 250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure

Large Image :  250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure

Product Details:
Place of Origin: China
Brand Name: WILFORD
Certification: ASME,CE
Model Number: WFQ
Payment & Shipping Terms:
Minimum Order Quantity: 1 stand
Price: Negotiable
Packaging Details: Standard export wooden Packing
Delivery Time: 15-20 working days
Payment Terms: L/C, T/T
Supply Ability: 10 stand/stands per Month

250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure

Description
Rated Evaporation: 250-1000kg/h Rated Working Pressure: 0.7Mpa
Staturated Steam Temperature: 170℃ Dimension(l*w*h): Customization
Structure: Water Tube Output: Steam
High Light:

gas powered steam generator

,

lpg steam generator

 

New Condition Skid - mounted Good Quality Gas Fired Steam Generator for sale

 

 

Product introduction

 

  • In order to meet customers' demand for high energy efficiency of steam and heat source, we designed a skid-mounted oil (gas) fired steam generator.

 

  • Modular design, convenient for user access to the pipeline, save room space.

 

  • Vertical structure, bright color, compact structure and easy installation.

 

  • Special specification boilers with other evaporation and working pressure can be provided according to customer requirements.


Parameter

 

                                      WFQSkid-mounted Oil(gas) Fired Steam Boiler
Model WFQ0.25-0.7-Y.Q WFQ0.5-0.7-Y.Q WFQ0.75-0.7-Y.Q WFQ1.0-0.7-Y.Q
Project Unit
Rated evaporation Kg/h 250 500 750 1000
Rated working pressure MPa 0.7 0.7 0.7 0.7
Staturated steam temperature 170 171 172 173
Fuel consumption Light diesel oil kg/h 16 32 48 64
Natural gas Nm³/h 19 38 57 76
LPG Nm³/h 7.6 15.2 22.8 30.4
City gas Nm³/h 40 80 120 160
Water capacity L 49.5 49.5*2 49.5*3 49.5*4
a Main steam valve diameter DN 32 40 50 50
b Safety valve diameter DN 25 25 25 25
c Inlet diamater DN 15 15 15 15
d Blowoff Valve diameter DN 25 25 25 25
e Chimney diameter DN 150 150 150 150
Overall size L mm 1500 1500 1500 1500
W mm 1100 1100*2 1100*3 1100*4
H mm 2200 2200 2200 2200


Feature

 

  • Modular design for quick and easy operation.

 

  • Small footprint and easy installation.

 

  • Flexible working style and saving manpower.

 

  • Energy saving and environmental protection.


Product picture

 

250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure 0

 

Product detail drawing

 

250-1000kg / H Skid - Mounted Gas Fired Steam Generator Water Tube Structure 1

 

FAQ


Q : Are you a factory or a trading company?


A : We are a 20-year-old industrial boiler factory , specializing in gas oil diesel electric fired boilers. Now we are one of leading industrial boiler manufacturers in China.


Q : What is the Warranty for the boilers?

 

A : Our steam boiler warranty is one year, During the warranty period, any parts damaged, you can get a new parts for free.

 

Q : How long should we wait for delivery?

 

A : Usually it will take about 35-45 days for pressured boilers, If you need to change the voltage or pressure, it need more time .


Q What about your payment term?


A : Usually it would be 30% deposit payment, 70% balance before delivery. We accept T/T, L/C and other payment way.

Contact Details
Zhangjiagang Wilford Thermal Co.,Ltd.

Contact Person: admin

Tel: +8617701567853

Send your inquiry directly to us (0 / 3000)