Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
—— Alain
—— Masud
—— James
—— TONNY
—— Сатиск
1.Built a gas steam boiler house.
2.Preparing piping as gas steam boiler technical data.
3.Preparing electricity as required.
4.Installed gas steam boiler as manual.
5.Commissioning gas steam boiler as manual.
6.Operating gas steam boiler.
1.One stop purchase all the boiler room configuration: boiler, water treatment, steam
header, steam outlet, chimney, etc.
2.The installation, commissioning, measurement of boiler room is completed before
leaving factory.
3.Transport to customer spot.
4.After the completion of the entire boiler room will connect water, electricity,gas or oil.
5.Start up to use and maintain daily maintenance.