Home ProductsGas Oil Boiler

Low Heat Loss Gas Oil Steam Boiler Equipment For Auxiliary Packaging

Certification
China Zhangjiagang Wilford Thermal Co.,Ltd. certification
China Zhangjiagang Wilford Thermal Co.,Ltd. certification
Customer Reviews
The quality of the boiler is very good. The service life of the boiler I purchased has reached more than 10 years.

—— Alain

The quality of your company's boilers has reached our standards, and the salesmen are doing their best to help me.

—— Masud

Your company's boilers are safe and durable, and we look forward to our next cooperation.

—— James

غلاية ذات نوعية جيدة ، وموقف موظفي ما بعد البيع جيدة جدا ، وكفاءة العمل عالية.

—— TONNY

Качество котла очень хорошее, торговый персонал очень терпелив, а обслуживание хорошее.

—— Сатиск

I'm Online Chat Now

Low Heat Loss Gas Oil Steam Boiler Equipment For Auxiliary Packaging

Low Heat Loss Gas Oil  Steam Boiler Equipment For Auxiliary Packaging
Low Heat Loss Gas Oil  Steam Boiler Equipment For Auxiliary Packaging Low Heat Loss Gas Oil  Steam Boiler Equipment For Auxiliary Packaging Low Heat Loss Gas Oil  Steam Boiler Equipment For Auxiliary Packaging

Large Image :  Low Heat Loss Gas Oil Steam Boiler Equipment For Auxiliary Packaging

Product Details:
Place of Origin: China
Brand Name: WILFORD
Certification: CE
Model Number: LSS
Payment & Shipping Terms:
Minimum Order Quantity: 1stand
Price: Negotiable
Packaging Details: Packing in wooden box
Delivery Time: 15-20 working days
Payment Terms: L/C, T/T
Supply Ability: 50 stand/stands per Month

Low Heat Loss Gas Oil Steam Boiler Equipment For Auxiliary Packaging

Description
Rated Evaporation: 0.5-2T/h Rated Working Pressure: 0.7/1.0/1.25Mpa
Staturated Steam Temperature: 170/193/184℃ Fuel: Natural Gas/Liquefied Gas/Pipeline Gas
Overall Size: Depend Weight: The Models Are Different
High Light:

1.25Mpa lpg fired steam boiler

,

Packaging gas powered steam boiler

 

Low Heat Loss Gas Fired Steam Boiler Equipment LSS Series For Auxiliary Packaging

 

 

Product introduction

 

  • LSS series products --water tube structure, vertical three return and burner on top design.

 

  • The boiler has controller protection and automatic recovery of the contactor to prevent electric shock function.

 

  • It also has dual anti reflux and exhaust heat protection devices, which, strengthen the safety function.

 

  • Each part of the flue gas is heat-transferred through three return strokes, which reduces the temperature of the flue gas and reduces the heat loss during boiler warm-up and shutdown.


Parameter

 

Type LSS0.5 LSS1 LSS1.5 LSS2
Project Unit
Rated evaporation t/h 0.5 1 1.5 2
Rated working pressure MPa 0.7/1.0 1.0/1.25 1.0/1.25 1.0/1.25
Staturated steam temperature 170/193 184/193 184/193 184/193
Fuel consumption Light diesel oil kg/h 35 70 105 140
Natural gas Nm³/h 40 80 120 160
LPG Nm³/h 15 30 45 60
City gas Nm³/h 85 170 265 340
a Main steam valve diameter DN 40 50 65 80
b Safety valve diameter DN 40 50 50 40×2
c Inlet diamater DN 25 25 32 40
d Blowoff Valve diameter DN 25 40 40 40
e Chimney diameter DN 250 350 400 500
Overall size L mm 1830 1980 2045 2550
W mm 1780 1980 2220 2780
H mm 2650 3080 3380 3620
H1 mm 2100 2300 2650 2880
φDiameter mm 1180 1380 1680 1980
Weight T 1.8/2.2 2.3/2.8 3.3/4 4.3/5.2

 

 

Feature

 

1 . Pipe flow type, vertical three return


2 . The furnace starts fast


3 . Low exhaust gas temperature and low heat loss


4 . High thermal efficiency


5 . Various protection devices are complete

 


Product picture

 

Low Heat Loss Gas Oil  Steam Boiler Equipment For Auxiliary Packaging 0
 

Project case diagram

 

Low Heat Loss Gas Oil  Steam Boiler Equipment For Auxiliary Packaging 1

 

FAQ

Q : Are you a factory or a trading company?
A : We are a 20 years old industrial boiler factory, specializing in gas oil diesel electric fired boilers.

Q : What is the Warranty for the boilers?

A : Our steam boiler warranty is one year, During the warranty period, any parts damaged, you can get a new parts for free.

Q : How long should we wait for delivery?

A : Usually it will take about 35-45 days for pressured boilers, If you need to change the voltage or pressure, it need more time.
Q : What about your payment term?
A : Usually it would be 30% deposit payment, 70% balance before delivery. We accept T/T, L/C and other payment way.

Contact Details
Zhangjiagang Wilford Thermal Co.,Ltd.

Contact Person: admin

Tel: +8617701567853

Send your inquiry directly to us (0 / 3000)